Vesgro Data Center is a former industrial-flex property where developers leveraged C-PACE to convert the vacant 113,406-square-foot facility into 45,000 square feet of raised-floor data hall space. The property owner financed energy-saving improvements through C-PACE, leveraging the program’s long-term, fixed-rate structure to significantly lower operational costs while improving asset performance. Impact By obtaining C-PACE financing,
600 E. Las Colinas Blvd. is a one-million-square-foot office building located in the Dallas suburb of Irving. The 22-story high-rise, situated in the heart of the Las Colinas Urban Center, underwent energy-efficienty upgrades in 2024 that qualified for C-PACE financing. The property owner retroactively financed the improvements through C-PACE, leveraging the program’s long-term, fixed-rate structure
Woodview Tower in Dallas is a 200,000-square-foot, 13-story office tower conveniently located near Dallas Love Field Airport. At the time of the application, the property was being renovated, and the owner opted to incorporate energy- and water-saving improvements that qualified for C-PACE financing. Impact By obtaining C-PACE financing, the property owner was able to upgrade
Cityscape Star is a newly built, upscale apartment complex located in Dallas’s vibrant Cedars district, just south of downtown — a neighborhood known for its artistic energy, transit access and rapid redevelopment. The $9 million C-PACE assessment allowed the owner to recapitalize state‑of‑the‑art efficiency systems installed during construction. The deal showcases one of C‑PACE’s most
Aloft Hotel is a 156-room hotel located in Dallas County. At the time of application, the property was being upgraded to incorporate energy and water savings and, therefore, qualified for C-PACE. Eligible improvements included in the assessment were building envelope, lighting, HVAC, domestic hot water, water reduction and high-efficiency elevators. Impact By obtaining C-PACE financing,
Hillcrest Oaks is an Dallas County office development consisting of two buildings spanning 183,967 SF of gross leasable area. The buildings were constructed in 1980 and are situated on 7.44 acres. This C-PACE assessment was for retroactive upgrades completed in 2021. Eligible C-PACE upgrades included improvements to building envelope, lighting, HVAC and plumbing. Impact By
Northridge Center is a 34,140 SF multi-tenant retail center on a 121,724 SF site. The subject was constructed in 1960. The property contains 12 suites, one of which has a restaurant finish-out. The utility saving components that were installed included building envelope, lighting and HVAC improvements. Impact By obtaining a C-PACE loan, the property owner
This five-story, 147,000-square-foot office building in the Dallas Design District also includes more than 10,000-square-feet of ground-level retail and three on-site restaurants. C-PACE financing furthered the project sponsor’s goal of obtaining LEED and Fitwel designations, which require the incorporation of sustainable systems that improve the health and wellness of building occupants and the environment. Impact
Washington Tower on the Baylor Medical Center campus in Dallas is a 55,000-square-foot, 1950s-era office building geared toward medical practitioners and ancillary services that support the hospital. The five-story tower includes 17 office suites that house an imaging center, pediatrics, gastroenterology and more. Impact By obtaining C-PACE financing, the property owner was able to upgrade
Developers behind this adaptive reuse project on Clarendon Drive in the East Oak Cliff area of Dallas sought to transform three dilapidated buildings into a vibrant mixed-use destination. The reimagined site will include 62,000 square feet of retail and industrial tenants such as yoga studios, coffee roasters, educational facilities, art studios and restaurants. Impact By